Fiber Optic Installation – Ciapus

Ciapus, Indonesia
  • Projected Return

    5-7%

  • Duration

    4-6 months

  • Goal

    SGD $117,196.00

  • Raised

    SGD $0.00

  • Time Remaining

    0 day(s) to go

Raised :
0%
Minimum amount is SGD $0 Maximum amount is SGD $0

About the campaign creator

×
azyan test
Ciapus, Indonesia
23 Campaigns | 0 Loved campaigns

Contact Info

Social Link